2024 MFT/RBI Street Resurfacing Project

Village of South Holland
2024 Street Resurfacing Program 

General Contractor:  D Construction – 815-671-6279 
Subcontractor: JJ Newell – Concrete – 708-862-1909  
Engineer: Robinson Engineering  
– John Hilsen: 708-359-5548  
– Jay Lauritzen: 708-514-4618  
Public Works Department: 708-339-2323 

 The scope of work varies throughout the project.  All areas listed below within the project will have the asphalt milled and removed and a new top surface of asphalt installed.  Some driveway aprons, sidewalks and curbs that are damaged will be replaced.  However, not all driveway aprons, sidewalks and curbs will be replaced.  Robinson Engineering has marked the locations where driveway aprons, sidewalks and curbs need to be replaced.  

Robinson Engineering is aware of existing sprinkler systems and will talk with the concrete contractor before they begin removing sidewalk.  If any damage occurs during construction the contractor will fix the problem. 

List of all locations that will be a part of the 2024 Street Resurfacing Program: 

STREET: 

FROM: 

TO: 

AVALON AVENUE 

156TH STREET 

158TH STREET 

WOODLAWN EAST AVENUE  

163RD STREET  

164TH PLACE 

165TH STREET  

WOODLAWN EAST AVENUE  

KIMBARK AVENUE 

MANOR DRIVE  

169TH PLACE  

168TH STREET 

MANOR COURT  

168TH STREET 

NORTH CUL-DE-SAC 

168TH STREET  

CARRINGTON DRIVE 

MERRILL AVENUE 

MERRILL AVENUE 

168TH STREET  

166TH PLACE 