2024 Sanitary Sewer Cured-In-Place Pipelining Project

Village of South Holland
2024 Sanitary Sewer Lining Project 

General Contractor:  Visu-Sewer of Illinois, LLC – 708-237-0340  
Engineer: Robinson Engineering  
– John Hilsen: 708-359-5548  
– Jay Lauritzen: 708-514-4618 

The scope of work varies throughout the project.  All of the highlighted sewer segments shown in the location map linked below will have the sewer lines lined with an internal sleeve that will cure in place and seal all cracks and extend the service life of the sewer mains located within the street right-of-way. The project is completed via access through the existing manholes, so the impact of this work is expected to have minimal disruption for residents and will provide benefit for all sewer system users.   The lining project will reduce the in-flow and infiltration of stormwater and sewage water from traveling outside the pipes.  The project includes rehabilitation of 3,250 Feet of existing sanitary sewer.  This work is tentatively scheduled to start in April 2024 and be completed by September 2024.

Map

Scroll to Top