2022 Sewer Slip Lining Project
Village of South Holland
2022 Sewer Slip Lining Project
General Contractor: Visu-Sewer of Illinois, LLC – 708-237-0340
Engineer: Robinson Engineering
– John Hilsen: 708-359-5548
– Jay Lauritzen: 708-514-4618
Public Works Department: 708-339-2323
The scope of work varies throughout the project. All of the listed areas will have the sewer lines lined with an internal sleeve that will cure in place and seal all cracks or damage. The lining project will reduce the in-flow and infiltration of stormwater and sewage water from traveling outside the pipes.
Sanitary Sewer Cured in Place Pipelining 2021 Map
List of all locations that will be a part of the 2022 Sewer Slip Lining Program:
Street | From | To |
166th Pl | 924 166th Pl | 943 166th Pl |
Cottage Grove Ave | 167th Pl | 168th St |
Ingleside Ave | Ellis Ave | 169th St |
Ellis Ave | 169th St | Ingleside Ave |
170th St | R x R Tracks | Evans Dr |
Evans Dr | 170th St | Drexel Ave |
Evans Ct | Evans Dr | Dead End |
170th St | Greenwood Ave | Kenwood Ave |
Prince Dr | 17010 Prince Dr | 17050 Prince Dr |
172nd St | 1140 172nd St | 1148 172nd St |