2022 Street Resurfacing Project
Village of South Holland
2022 Street Resurfacing Program
General Contractor: Gallagher Asphalt Corp – 708-877-7160
Subcontractor: JJ Newell – Concrete – 708-862-1909
Engineer: Robinson Engineering
– John Hilsen: 708-359-5548
– Jay Lauritzen: 708-514-4618
Public Works Department: 708-339-2323
The scope of work varies throughout the project. All of the listed areas will have the asphalt milled and removed and a new top coat of asphalt installed. Some driveway aprons, sidewalks and curbs that are damaged will be replaced. However, not all driveway aprons, sidewalks and curbs will be replaced. Robinson Engineering has marked the locations where driveway aprons, sidewalks and curbs need to be replaced.
Robinson Engineering is aware of existing sprinkler systems and will talk with the concrete contractor before they begin removing sidewalk. If any get damage occurs during construction the contractor will fix the problem.
Map/Plan for 2022 street resurfacing
List of all locations that will be a part of the 2022 Street Resurfacing Program:
Street | From | To |
Woodlawn Ave | 154th St | 155th St |
King Circle | King Dr | End of Cul-de-Sac |
University Ave | 160th Pl | 161st Pl |
164th Pl | Wausau Ct | Louis Ave |
Wausau Ct | 164th Pl | 165th St |
165th St | Wausau Ct | Louis Ave |
Louis Ave | 164th Pl | 165th Pl |
165th Pl | Wausau Ave | Louis Ave |
169th St | Canal St | to Dead End |
Westview Ave | 169th St | Armory Dr |
171st St | Ingleside Ave | Dobson Ave |
Ellis Ct | 172nd St | to Dead End |
University Ave | 172nd St | 173rd Pl |
173rd Pl | University Ave | Kimbark Ave |
Kimbark Ave | 172nd St | 173rd Pl |
172nd St | University Ave | Kenwood Ave |
Carrington Dr | 169th Pl | 170th St |
Merrill Ave | 168th St | 170th St |