2023 Street Resurfacing Project
Village of South Holland
2023 Street Resurfacing Program
General Contractor: Gallagher Asphalt Corp – 708-877-7160
Subcontractor: JJ Newell – Concrete – 708-862-1909
Engineer: Robinson Engineering
– John Hilsen: 708-359-5548
– Jay Lauritzen: 708-514-4618
Public Works Department: 708-339-2323
The scope of work varies throughout the project. All of the listed areas will have the asphalt milled and removed and a new top coat of asphalt installed. Some driveway aprons, sidewalks and curbs that are damaged will be replaced. However, not all driveway aprons, sidewalks and curbs will be replaced. Robinson Engineering has marked the locations where driveway aprons, sidewalks and curbs need to be replaced.
Robinson Engineering is aware of existing sprinkler systems and will talk with the concrete contractor before they begin removing sidewalk. If any get damage occurs during construction the contractor will fix the problem.
Map/Plan for 2023 street resurfacing
List of all locations that will be a part of the 2023 Street Resurfacing Program:
Street | From | To |
157th St | 9th Ave | LaSalle St |
Thornton-Blue Island Rd | Vincennes Rd | West of Van Drunen Rd |
Prince Dr | 156th St | 158th St |
Dante Dr | 158th St | Dead End |
Woodlawn East Ave | 159th Pl | 162nd St |
160th Pl | Minerva Ave | Woodlawn East Ave |
Ellis Ave | 162nd St | 162nd Pl |
165th Pl | Woodlawn East Ave | Kimbark Ave |
Kimbark Court | 167th St | to Dead End |
Kimbark Ave | 167th St | to Dead End |
Kimbark Ave | 170th St | 172nd St |
171st Ct | Kimbark Ave | to Dead End |
Clyde Ave | 168th St | 169th Pl |